UDQuickly Home My Old House Snapshots UD Magazine
Send A Class Notes


University of Dayton Magazine
door repair at alumni hall by Larry Burgess

Squaring it away

1:02 PM  Sep 10th, 2013
by Larry Burgess

Brad Lauterbach of facilities management removes the bar clamps from one of two western entrance doors he’s repairing at Alumni Hall. The purpose of the work is to ease the door’s sticking problem and keep it square. It’s believed the doors at this entrance are the originals from when the building first opened.
9-10-13 by Larry Burgess

Leave a Reply

Your email address will not be published. Required fields are marked *

Connect with Facebook


You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

  • sunset over the College Park Center
  • Campus tour and class changes with colorful fall trees by Larry Burgess
  • Roof replacement work continues on Roesch Library by Larry Burgess
  • 082610firstweek
  • 091009Rudy
  • fresh food market in hm plaza by Larry Burgess
  • student working in visual arts education class by Larry Burgess
  • Civil Engineering Summer Session
  • Student practices tuba in CPC by Larry Burgess
  • bike path construction on east edge of campus by Larry Burgess
  • Kiefaber repaved
  • ballet class
  • Engineering student using a mill in the lab by Zoey Xia
  • 100110StuartHall
  • baking bread at the grainary in vwk by Larry Burgess
  • UD Move In
  • 011106clock2
  • 111509soccer