UDQuickly Home My Old House Snapshots UD Magazine
Send A Class Notes

@DayMag

University of Dayton Magazine
Chapel construction continues on the roof by Larry Burgess

Under the dome

1:29 PM  Aug 28th, 2014
by Larry Burgess

Chapel construction workers are at roof level today removing roofing materials in sunny 78-degree weather, lower humidity, and hardly any wind at all. Our clear as a bell blue sky reaches out to Iowa before it sees rain.
8-28-14 by Larry Burgess

Leave a Reply

Your email address will not be published. Required fields are marked *

Connect with Facebook


*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

  • snare drum line by Larry Burgess
  • Construction Roesch Library roof work by Larry Burgess.
  • Let's Try It This Way.
  • 060109mowing
  • caldwell construction roof trusses by Larry Burgess
  • summer civil engineering students by Larry Burgess
  • Fall Leaves and Chaminade Statue copy
  • workers install windows in science center near pendulum in summer by Larry Burgess
  • 1700 entrance by Larry Burgess
  • first snow of winter
  • Workers load a vestments locker into a van during chapel renovation by Larry Burgess
  • Marian Library's crèche display
  • 052109goslings
  • 120810CoCCentralMall2
  • 020106Sherman
  • Poster sale outside UD Bookstore by Larry Burgess
  • wind tunnel
  • Early Move-In by Stephanie Lefeld '13