UDQuickly Home My Old House Snapshots UD Magazine
Send A Class Notes


University of Dayton Magazine
Chapel construction continues on the roof by Larry Burgess

Under the dome

1:29 PM  Aug 28th, 2014
by Larry Burgess

Chapel construction workers are at roof level today removing roofing materials in sunny 78-degree weather, lower humidity, and hardly any wind at all. Our clear as a bell blue sky reaches out to Iowa before it sees rain.
8-28-14 by Larry Burgess

Leave a Reply

Your email address will not be published. Required fields are marked *

Connect with Facebook


You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

  • bowling at ku by Larry Burgess
  • MLK monumant is installed by Larry Burgess
  • Pride of Dayton
  • 102909wsoccer
  • St. Joseph Hall
  • window washers at recplex by larry burgess
  • Recplex swimming pool gets new plaster by Larry Burgess
  • statue of Mary with the moon
  • setting up flags of the states on stage at RISE '13 at ud arena by Larry Burgess
  • A robin watches over her nest, built in a tree located in the Mary Garden on the north side of Immaculate Conception chapel, during the afternoon of Tuesday, June 4.
  • 6.9
  • facilities workers remove leaves by Larry Burgess
  • Tulips in Kennedy Union Plaza by Zoey Xia
  • john mccombe rides a stationary bike at rec plex by Larry Burgess
  • Workers paint the logo of the Atlantic 10 Conference on Baujan FIeld by Larry Burgess
  • RecPlex University of Dayton Ethan Klosterman
  • LTC worker with computer fireplace beside him on a really cold dayby Larry Burgess
  • _MG_6139 copy