UDQuickly Home My Old House Snapshots UD Magazine
Send A Class Notes

@DayMag

University of Dayton Magazine
Chapel construction continues on the roof by Larry Burgess

Under the dome

1:29 PM  Aug 28th, 2014
by Larry Burgess

Chapel construction workers are at roof level today removing roofing materials in sunny 78-degree weather, lower humidity, and hardly any wind at all. Our clear as a bell blue sky reaches out to Iowa before it sees rain.
8-28-14 by Larry Burgess

Leave a Reply

Your email address will not be published. Required fields are marked *

Connect with Facebook


*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

  • reflection of Miriam in a puddle
  • Students walk by colorful leaves by Larry Burgess
  • Kettering sculpture by Larry Burgess
  • Students working in the theater department's costume shop by Larry Burgess
  • Better gas lines installed.
  • girls with balloon animals
  • 051806heritage
  • 060409aerial
  • mowing the soccer field
  • pac-man on campus by Larry Burgess
  • 091009Rudy
  • two canada geese at 1700 in the lagoon by Larry Burgess
  • purple flowers in the snow by Larry Burgess
  • Pre chapel construction survey work by Larry Burgess
  • 120814  Caldwell Apartments  Shuey
  • class outside
  • Joanna Bologna makes a latte at The Blend Express by Larry Burgess
  • ROTC cadets sell tee shirts outside Kennedy Union by Larry Burgess